Request Quote

We will contact you within one working day. Please pay attention to your email.

SUBMIT
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
+
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Product description
  • The concept of bowl-lock scaffolding

    • The cup-lock system consists of components such as steel pipe uprights, crossbars, and cup-lock joints. Its basic structure and installation requirements are similar to those of hook-type steel tube scaffolding, with the main difference lying in the cup-lock joint itself.

    • The bowl-type connector consists of components such as the upper bowl buckle, lower bowl buckle, crossbar joint, and upper bowl buckle positioning pin. The positioning pins of the lower and upper bowl buckles are welded onto the vertical post, with the upper bowl buckle fitted over the post. The plugs are welded onto the crossbars and diagonal braces. During assembly, insert the crossbars and diagonal braces into the lower bowl buckle, press down while rotating the upper bowl buckle, and finally secure the upper buckle using the positioning pin.

    • Cup-lock steel tube scaffolding features a horizontal distance of 1.2m between uprights, while the longitudinal spacing can be adjusted based on the scaffold’s load capacity to 1.2m, 1.5m, 1.8m, or 2.4m. The step distance is either 1.8m or 2.4m. When assembling the uprights, their joints must be staggered. For the first layer of uprights, rods measuring 1.8m and 3.0m should be arranged alternately; for upper layers, uniformly use 3.0m-long rods. Once reaching the top level, recombine two shorter rods (1.8m and 3.0m) to achieve proper leveling.

    • For scaffolds with a height of less than 30m, the verticality deviation should be kept within 1/200. For supports taller than 30m, the verticality deviation must be controlled between 1/400 and 1/600. Additionally, the overall verticality deviation of the entire scaffold should not exceed 100mm.

    Features of Cuplock Scaffolding

    Key features:

    • The joint structure of the bowl-lock multifunctional scaffolding is well-designed, features a simple manufacturing process, offers convenient operation, and boasts a wide range of applications. Compared to traditional folding systems, the bow-lock type multifunctional foldable system has the following outstanding advantages:

    • The bowl-lock joint features a rational design: the load-transferring rods transfer forces axially, giving the scaffolding high structural strength and excellent three-dimensional spatial stability, ensuring it meets safety requirements for construction work.

    • Flexible scaffolding assembly templates. This includes 0.6m single-row scaffolds, double-row scaffolds, support frames, and various modular construction equipment designed for material lifting and load-bearing applications. These components can also be arranged in curved configurations, making them suitable for use on terrains with varying heights. Additionally, the spacing of the scaffolding can be adjusted according to

    • Different load requirements call for flexible adjustments. All components of the cup-lock scaffolding system share uniform dimensions, ensuring that the erected scaffolds are standardized and highly organized.

    • It boasts high assembly and disassembly efficiency, significantly reducing labor intensity. Assembly and disassembly speeds are 3 to 5 times faster than those of hook-type scaffolding.

    • It eliminates the need for bolt operations, making it less likely that scattered parts will get lost. The components are lightweight yet robust, ensuring safe and reliable use. Generally, rust does not affect assembly or disassembly—plus, they’re easy to maintain and convenient for transportation.

    • It can be retrofitted using existing coupler-type steel pipe scaffolding, significantly reducing the costs associated with upgrades and replacements.

    Bowl-lock scaffolding pole accessories and their applications

    (a) Upright Posts: These are fabricated by attaching a 0.6-meter curved rod to a sleeve-shaped section with a diameter of 48 mm x 3.25/3.0 mm, extending over a specified length, and then welding a vertical post connection tube at the top. They serve as the vertical load-bearing elements of the scaffolding system. 
    (b) Top Rods (Vertical Top Rods): Equipped with vertical rod connecting tubes at the top, these rods are used to support the low insertion of the supporting posts. They serve as vertical load-bearing members at the tops of supporting frames (columns), material-lifting frames, and similar structures. 
    (c) Crossbar: Made by welding a 48mm x 3.5mm sawn steel bar to the waist of ceramic-length steel pipes at both ends, this crossbar serves as a horizontal connecting pipe between upright posts or as a horizontal load-bearing rod for the frame. 
    (d) Single horizontal bar: Features bar connection ends made of 48mm x 3.5mm steel tubing. These are used as horizontal crossbars for single-row scaffolding. 
    (e) Diagonal braces: Manufactured by riveting diagonal brace connectors to both ends of a 48mm diameter x 3.5mm thick sleeve. These are used to enhance the stability and strength of the scaffolding, significantly improving its load-bearing capacity. Diagonal braces should be positioned as close as possible to the frame nodes. 
    (f) Base: Constructed by welding a connecting rod through the center of a 150mm x 150mm x 8mm sleeve plate. These bases are located at the root of the upright posts, serving to prevent post sway and to distribute/transfer the upper loads down to the foundation.

    Key Points for Construction Control of Cuplock Scaffolding

    Product NameModelSpecifications (mm)Weight (kg)
    Erect the poleLG-50φ48 × 3.25 × 5002.43
    LG-100φ48 × 3.25 × 10004.85
    LG-120φ48 × 3.25 × 12007.05
    LG-150φ48 × 3.25 × 15007.28
    LG-180φ48 × 3.25 × 18008.35
    LG-200φ48 × 3.25 × 20009.70
    LG-240φ48 × 3.25 × 240013.34
    LG-250φ48 × 3.25 × 250012.13
    LG-300φ48 × 3.25 × 300014.80
     LG-50φ48 × 3.0 × 5002.3
    LG-100φ48 × 3.0 × 10004.59
    LG-150φ48 × 3.0 × 15006.89
    LG-180φ48 × 3.0 × 18007.88
    LG-200φ48 × 3.0 × 20009.18
    LG-250φ48 × 3.0 × 250011.48
    LG-300φ48 × 3.0 × 300013.77
    Horizontal barHG-30φ48 × 3.25 × 3001.32
    HG-60φ48 × 3.25 × 6002.37
    HG-80φ48 × 3.25 × 8003.45
    HG-90φ48 × 3.25 × 9003.63
    HG-100φ48 × 3.25 × 1003.81
    HG-120φ48 × 3.25 × 12004.78
    HG-130φ48 × 3.25 × 13004.89
    HG-150φ48 × 3.25 × 15005.93
    HG-160φ48 × 3.25 × 16005.97
    HG-180φ48 × 3.25 × 18007.08
    HG-200φ48 × 3.25 × 20007.41
    HG-210φ48 × 3.25 × 21007.77
    HG-250φ48 × 3.25 × 25009.21
    HG-300φ48 × 3.25 × 300011.01
    Horizontal barHG-60φ48 × 3.0 × 6002.23
    HG-80φ48 × 3.0 × 8002.89
    HG-90φ48 × 3.0 × 9003.23
    HG-100φ48 × 3.0 × 10003.56
    HG-120φ48 × 3.0 × 12004.23
    HG-130φ48 × 3.0 × 13004.56
    HG-150φ48 × 3.0 × 15005.23
    HG-160φ48 × 3.0 × 16005.56
    HG-180φ48 × 3.0 × 18006.23
    HG-200φ48 × 3.0 × 20006.89
    HG-210φ48 × 3.0 × 21007.22
    HG-250φ48 × 3.0 × 25008.56
    HG-300φ48 × 3.0 × 300010.22
    CrossbarJHG-90φ48 × 9004.37
    JHG-120φ48 × 12005.52
    JHG-120+30φ48 × (1200 + 300)6.85
    JHG-120+60φ48 × (1200 + 600)8.16
    Diagonal braceXG-0912φ48 × 15006.33
    XG-1212φ48 × 17007.03
    XG-1218φ48 × 21608.66
    XG-1518φ48 × 23409.30
    XG-1818φ48 × 255010.04

     

    Product NameModelSpecificationsWeight (kg)
    Dedicated diagonal braceZXG-0912φ48 × 12705.89
    ZXG-0918φ48 × 17507.73
    ZXG-1212φ48 × 15006.76
    ZXG-1218φ48 × 19208.37
    Narrow Cantilever BeamTL-30Width: 300mm1.53
    Wide Cantilever BeamTL-60Width: 600mm8.60
    Pole connection pinLLXφ100.18
    Adjustable baseKTZ-45T38×6, adjustment range ≤ 300mm5.82
    KTZ-60T38×6, adjustment range ≤ 450mm7.12
    KTZ-75T38×6, adjustment range ≤ 600mm8.50
    Adjustable Support BeamKTC-45T38×6, adjustment range ≤ 300mm7.01
    KTC-60T38×6, adjustment range ≤ 450mm8.31
    KTC-75T38×6, adjustment range ≤ 600mm9.69

    Pedal

    SpecificationsThicknessLengthFlat support weightSquare support weight
    210 × 451.0 mm1m2.93
    1.5m4.34.45
    2m5.75.8
    2.5m7.17.4
    3m8.58.86
    4m11.311.9
    210 × 451.11m3.23.3
    1.5m4.74.9
    2m6.36.5
    2.5m7.88.1
    3m9.39.7
    4m12.412.9
    210 × 451.2mm1m3.453.5
    1.5m5.15.3
    2m5.87
    2.5m8.468.7
    3m10.110.5
    4m13.4613.9
    210 × 451.5 mm1m4.264.33
    1.5m6.36.5
    2m8.48.6
    2.5m10.510.76
    3m12.5512.9
    4m16.717.2
    240 * 451.0 mm1m3.23.3
    1.5m4.75
    2m6.266.6
    2.6m7.88.2
    3m9:039.86
    4m12.413.1
    240 * 451.1 mm1m3.53.6
    1.5m5.25.4
    2m6.847.3
    2.5m8.59
    3m10.210.7
    4m13.614.3
    240 * 451.2 mm1m3.83.9
    1.5m5.65.8
    2m7.57.76
    2.5m9.2511.6
    3m11.19.7
    4m14.716.5
    240 * 451.5 mm1m4.64.8
    1.5m6.97.15
    2m9.29.5
    2.5m11.411.9
    3m13.814.25
    4m18.219
    250 * 501mm1m3.53.6
    1.5m5.15.3
    2m6.87
    2.5m8.48.7
    3m9.910.4
    4m13.113.8
    250 * 501.1mm1m3.83.9
    1.5m5.55.75
    2m7.37.6
    2.5m9.19.5
    3m10.811.35
    4m14.314.9
    250 * 501.2mm1m4.14.2
    1.5m66.2
    2m7.98.2
    2.5m9.810.25
    3m11.712.3
    4m16.6316
    250 * 501.5mm1m55.1
    1.5m7.47.6
    2m9.7510.1
    2.5m12.112.6
    3m14.515
    4m19.219.8
    225 * 381.5 mm1m 4.5
    1.5m 6.6
    2m 8.8
    2.5m 10.9
    3m 12.83
    4m 17.39
    225 * 381.8 mm1m 4.92
    1.5m 7.44
    2m 10
    2.5m 12.48
    3m 15.25
    4m 20.3

    Main dimensions and general specifications of cup-lock scaffolding

    Serial NumberProject NameRegulatory requirements
    1Structural facadeOrdinary scaffolding with a height H ≤ 20m should be erected using conventional methods; scaffolding taller than H > 20m must undergo specialized construction design and structural calculations.
    2Load LimitConstruction scaffolding must not exceed 2.7 kN/m²; decorative scaffolding should be between 1.2 and 2.0 kN/m², or determined based on actual conditions.
    3Basic approachThe foundation should be level, compacted, and equipped with drainage measures. Vertical posts must have base plates, and 0.05m × 0.2m × 2m wooden scaffold boards should be laid beneath them. For scaffolding taller than 40 meters, a foundation calculation must be performed to determine the appropriate laying method.
    4Vertical spacing of upright postsTypically between 1.2 and 1.5 meters. If it exceeds this range, a verification calculation is required.
    5Vertical post spacing≤ 1.2 meters
    6FastenerAll high-rise scaffolds with a height H > 30m must have their lower half (H/2) supported by toothed bowl-lock connectors.

    Construction preparation before scaffolding erection: 
    ① Level the site ground. To ensure the scaffolding is safe, stable, and neatly arranged after installation, the ground must be firmly compacted and leveled. Place 50mm-thick full-length base plates for the uprights according to the specified layout requirements. Make sure the base plates are securely in contact with the ground. Next, position the uprights based on the required spacing—use a pen to mark their exact locations—and carefully set the upright bases precisely at these marked spots, ensuring each base sits squarely in the center of its corresponding plate. 
    ② Place the sweeping pole and then erect the vertical pole. Before starting to raise the vertical pole, first prepare the horizontal bar, position it in place, and join multiple sections together to extend its length—only after that should you proceed to stand up the vertical pole.

Product Application


Production


Bow-clip scaffolding workshop (4)
Bow-扣 Scaffolding Factory Building (3)
Bow-扣 Scaffolding Workshop (2)
Bowl-Clamp Scaffolding Workshop (1)
Mobile scaffolding (4)
Mobile scaffolding (3)
Mobile scaffolding (2)
Mobile Scaffolding (1)

Customization


Customer Inquiry

Factory Quotation

Customer Orders

Factory Production

Quality Testing

Packaging & Shipping

FAQ


Can you accept small quantities?

Yes, accept small quantity, fast delivery

Do you have pre-shipment inspection procedures?

Yes, we always test the products before delivery.

Can I take samples for testing?

Yes, samples can be sent for testing before bulk ordering.

When is the delivery time?

Inventory orders within 7-15 days, for oem and odm orders, the specific time depends on the actual situation.

What are the terms of payment?

Wire transfer or letter of credit, Western Union, Alipay, etc.

What is the minimum order quantity?

It depends on the product.

Packing and shipping


Product shipment
Shipping and loading the truck
Shipping Display
Loading and shipping

Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
Painted bowl-lock scaffolding
+
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding
  • Painted bowl-lock scaffolding

Painted bowl-lock scaffolding

The bowl-lock joint features a rational structure: the load-transferring rods transfer force axially, giving the scaffolding as a whole high structural strength and excellent three-dimensional spatial stability, thereby meeting construction safety requirements.

If you need customized delivery products,  Contact US !

Share to

Products Category

Tag list

Request a Quote

We will contact you within one working day. Please pay attention to your email.