Request Quote

We will contact you within one working day. Please pay attention to your email.

SUBMIT
Erect the pole and secure the bowl.
Erect the pole and secure the bowl.
+
  • Erect the pole and secure the bowl.
  • Erect the pole and secure the bowl.
  • Product description
  • Sliding Nesting: The upper bowl clamp is inserted into the vertical post and can slide along the post’s axial direction, locking securely via rotation.
    Spiral locking: The upper bowl clamp features a spiral locking mechanism that, when rotated, tightly engages with the positioning pin, creating a strong mechanical interlocking force to ensure a secure connection between the crossbar and upright post.

    Functional Advantages

    Quick locking : Workers can complete the installation with just a single hammer, and the assembly and disassembly process is 3 to 5 times faster than traditional fastener-based scaffolding.

    Structurally stable: The rod members converge at a single point, and the joints exhibit reliable bending, shear, and torsional mechanical performance, resulting in a load-carrying capacity that is more than 15% higher than traditional scaffolding systems.

    Safe and reliable

    Two-way self-locking design: The locking mechanism between the crossbar and upright post is achieved through the structural design, reducing the instability associated with manual locking.
    Independent locking: Multiple horizontal and vertical rods connected at the same node do not interfere with each other, eliminating the risk of traditional scaffolding systems where "one loose link causes the whole system to collapse."
    The lower bowl connector has strong shear resistance, and even if the upper bowl connector isn’t fully tightened, the crossbar joint will not come loose.

    Highly adaptable

    Supports both straight and curved configurations; any curved scaffolding with a curvature radius greater than 1.7 meters can be erected.
    Suitable for a variety of scenarios, including bridges, buildings, tunnels, and towering structures.

Product Application


Production


Bow-clip scaffolding workshop (4)
Bow-扣 Scaffolding Factory Building (3)
Bow-扣 Scaffolding Workshop (2)
Bowl-Clamp Scaffolding Workshop (1)
Mobile scaffolding (4)
Mobile scaffolding (3)
Mobile scaffolding (2)
Mobile Scaffolding (1)

Customization


Customer Inquiry

Factory Quotation

Customer Orders

Factory Production

Quality Testing

Packaging & Shipping

FAQ


Can you accept small quantities?

Yes, accept small quantity, fast delivery

Do you have pre-shipment inspection procedures?

Yes, we always test the products before delivery.

Can I take samples for testing?

Yes, samples can be sent for testing before bulk ordering.

When is the delivery time?

Inventory orders within 7-15 days, for oem and odm orders, the specific time depends on the actual situation.

What are the terms of payment?

Wire transfer or letter of credit, Western Union, Alipay, etc.

What is the minimum order quantity?

It depends on the product.

Packing and shipping


Product shipment
Shipping and loading the truck
Shipping Display
Loading and shipping

Previous:

Next:

Erect the pole and secure the bowl.
Erect the pole and secure the bowl.
+
  • Erect the pole and secure the bowl.
  • Erect the pole and secure the bowl.

Erect the pole and secure the bowl.

Spiral locking: The upper bowl clamp features a spiral locking mechanism that, when rotated, tightly engages with the positioning pin, creating a robust mechanical interlocking force to ensure a secure connection between the crossbar and upright post.

If you need customized delivery products,  Contact US !

Share to

Request a Quote

We will contact you within one working day. Please pay attention to your email.