- Product description
-
Core Role
Fixing and Supporting Reinforcing Bars: The primary function of steel horse stools is to separate and secure the reinforcement bars in the upper and lower layers, preventing the bars from deforming or shifting during concrete pouring. For instance, during the construction of cantilevered slabs—such as balconies or canopies—steel horse stools help stabilize the position of the load-bearing longitudinal reinforcement, ensuring it doesn’t sag due to foot traffic. This, in turn, safeguards the structural integrity of the project.
Enhancing Structural Load-Bearing Capacity: By securing the top steel reinforcement mesh, the iron horse stools can withstand construction activity loads (such as pedestrian traffic and equipment vibration), significantly enhancing the collapse resistance of cantilevered sections (like balconies and cast-in-place slabs).
Improve construction efficiency: The steel horse stool is lightweight and comes in standardized dimensions, making it easy to transport and install. It’s reusable, helping to reduce construction costs and minimize resource waste. Moreover, its construction efficiency is dozens of times higher than that of traditional plastic stools.Product Features
Materials and Strength: Made from low-carbon steel (such as Q235 or Q195 steel), it features high strength, antistatic properties, and shock resistance, allowing it to bond tightly with cement and withstand significant construction loads.
Rust-proofing treatment: The legs are coated with a plastic layer to prevent oxidation and corrosion, extending their lifespan.
Structural Science: It is welded together from a crossbeam and five pairs of legs; the crossbeam typically has a diameter of 5.5 mm, while the legs are made of 4-mm low-carbon steel. The design adheres to mechanical principles, ensuring stability.
Product Application
Production
Customization
Customer Inquiry
Factory Quotation
Customer Orders
Factory Production
Quality Testing
Packaging & Shipping
FAQ
Can you accept small quantities?
Yes, accept small quantity, fast delivery
Do you have pre-shipment inspection procedures?
Yes, we always test the products before delivery.
Can I take samples for testing?
Yes, samples can be sent for testing before bulk ordering.
When is the delivery time?
Inventory orders within 7-15 days, for oem and odm orders, the specific time depends on the actual situation.
What are the terms of payment?
Wire transfer or letter of credit, Western Union, Alipay, etc.
What is the minimum order quantity?
It depends on the product.
Packing and shipping
Previous:
Next:
Iron Horse Stool
If you need customized delivery products, Contact US !
Products Category
Tag list
Request a Quote
We will contact you within one working day. Please pay attention to your email.